Buyers usually price the masterbatch and ignore the cycle. This note is about the cycle.
An injection cycle has four phases: filling, holding, cooling, ejection. For thick parts such as pallets, cooling accounts for 60–70% of the cycle. The main lever is cooling, not injection speed.
Cooling time depends on two things: how much heat must be removed to reach ejection temperature, and when the material becomes stiff enough to eject — that is, when crystallisation has progressed far enough.
A nucleator acts on the second: it starts crystallisation at a higher temperature and completes it faster, so the part can be ejected sooner. That is why 2% of a nucleating masterbatch can remove over 40% of the cycle.
| Metric | +15% LLDPE | +2% E2625 |
|---|---|---|
| Cycle time per pallet | 128 s | 74 s (−42%) |
| Daily output, same machine and shift | 675 | 1167 (+73%) |
| Daily power use | baseline | −1673 kWh (−73%) |
At an industrial tariff of CNY 0.70/kWh, one machine saves 1673 kWh per day:
That is usually larger than the annual masterbatch purchase. The correct evaluation puts cycle benefit and additive cost in the same calculation.
Not all of it is the cycle. Two more effects:
All three together produce that magnitude. A 42% cycle reduction alone cannot explain a 73% energy reduction — which is why we emphasise that "targeted" means nucleation and lubrication together.
Tell us your resin grade, processing temperature, part thickness and the property you need to improve. We recommend a grade and dosage, ship 1–5 kg, and follow up with comparative data.
Or call Mr. Luo +86 135 5407 7117 +86 130 0101 5295